ASM Failure Analysis Case Histories: Steelmaking and Thermal Processing Equipment
Failure of Recuperator with Austenitically Welded Pipes
-
Published:2019
Abstract
A recuperator used for preheating the combustion air for a rolling mill furnace failed after a relatively short service time because of leakage of the pipes in the colder part. The 6 % chrome steel pipes used for the warmer part connected by means of welding with austenitic electrodes to the unalloyed mild steel pipe of larger diam. Visual inspection showed corrosion and deep, trench-like erosion over the entire circumference of the seam on the side of the thicker mild steel pipe. Examination using the V2-A solution for picral etch showed the microstructure of the unalloyed pipe had become...
Sign in
ASM members
Member Sign InFriedrich Karl Naumann, Ferdinand Spies, Failure of Recuperator with Austenitically Welded Pipes, ASM Failure Analysis Case Histories: Steelmaking and Thermal Processing Equipment, ASM International, 2019, https://doi.org/10.31399/asm.fach.steel.c9001159
Download citation file:
Join ASM International
Being a member of the world’s largest association of materials professionals provides the benefits and resources you need to accomplish your personal and professional goals.