Abstract
This work presents a novel method of continuous improvement for faster, better and cheaper TEM sample preparation using Cut Look and Measure (CLM). The improvement of the process is executed by operational monitoring of daily beam conditions, end products, bulk thickness control, recipe usage and tool running time. This process produces a consequent decrease in rework rate and process time. In addition, it also increases throughput with better quality TEM samples.
This content is only available as a PDF.
Copyright © 2016 ASM International. All rights reserved.
2016
ASM International
Issue Section:
Sample Preparation
You do not currently have access to this content.