Abstract
Tower successfully completed a product qualification of its 130nm copper process this year. The key to this achievement was finding and eliminating a dominant failure mechanism, which appeared during HTOL stress. This paper will cover the failure analysis, in-line problem identification, and corrective actions taken that eventually lead to successful product qualification.
This content is only available as a PDF.
Copyright © 2006 ASM International. All rights reserved.
2006
ASM International
Issue Section:
Advanced Techniques
You do not currently have access to this content.