Skip to Main Content
Skip Nav Destination

In-process inspection during composite material lay-up is essential if the structural, dimensional, and environmental performance designed into a part is to be consistently achieved. This article discusses the requirements to be met by the facilities and equipment to produce high-quality composites. It reviews the procedures that are allowed and prohibited in controlled-contamination areas of lay-up. The article emphasizes significant areas, such as material control and lay-up process, in which quality-control personnel can be effective in preventing production problems. It concludes with a discussion on automated tape laying and fiber placement, as well as the numerically aided lay-up process.

You do not currently have access to this chapter.
Don't already have an account? Register
Close Modal

or Create an Account

Close Modal
Close Modal