Introduction to Quality Assurance
-
Published:2001
Abstract
This article presents the importance of progressing from post-manufacturing inspection/verification to in-process inspection/verification methods. It lists the various quality assurance factors considered for typical composite laminate lay-up process. The article provides information on composite cure tooling that is fabricated from steel, aluminum, or high-temperature composite materials. The quality assurance for commercial applications is reviewed. The article concludes with a discussion on data fusion systems designed to provide nondestructive analysis data from fabrication and assembly processes for each individual composite part.
Grover Aaron Henson, III, Introduction to Quality Assurance, Composites, Vol 21, ASM Handbook, Edited By Daniel B. Miracle, Steven L. Donaldson, ASM International, 2001, p 677–678, https://doi.org/10.31399/asm.hb.v21.a0003431
Download citation file:
Sept. 30 – Oct. 4 | Cleveland, Ohio
Keep up to date with the latest materials and processing technologies. Register today for IMAT 2024 & IFHTSE World Congress!