Skip to Main Content

Abstract

Boiler tube failures associated with material defects are often the result of poor quality control, whether in primary production, on-site fabrication, storage and handling, or installation. This chapter examines quality-related failures stemming from compositional and structural defects, forming and welding defects, design defects, improper cleaning methods, and ineffective maintenance. It also includes case studies and illustrations.

You do not currently have access to this chapter.
Don't already have an account? Register

2018. "Failures Due to Lack of Quality Control or Improper Quality Control", Failure Investigation of Boiler Tubes: A Comprehensive Approach, Paresh Haribhakti, P.B. Joshi, Rajendra Kumar

Download citation file:


Close
Close Modal
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close Modal
Close Modal