1-20 of 31 Search Results for

staff

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Series: ASM Failure Analysis Case Histories
Volume: 3
Publisher: ASM International
Published: 01 December 2019
DOI: 10.31399/asm.fach.v03.c9001753
EISBN: 978-1-62708-241-9
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.conag.c9001633
EISBN: 978-1-62708-221-1
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.mech.c9001614
EISBN: 978-1-62708-225-9
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.auto.c9001732
EISBN: 978-1-62708-218-1
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.conag.c9001588
EISBN: 978-1-62708-221-1
... as to the circumstances, causes, and origins of this failure. FaAA evaluated relevant documentation and all physical evidence. Witnesses, staff, and consultants were interviewed regarding the design and manufacturing of the truss, as well as operation, controls, and maintenance. In order to reconstruct the collapse...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.usage.c9001584
EISBN: 978-1-62708-236-5
... staff of Practical Failure Analysis does not want to take sides or favor either side of a case under litigation. Additionally, the PFA staff does not want the publication to be used to enhance or refute the position of either side of a pending case. The positions expressed by Dr. Rau in the inaugural...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.conag.c9001431
EISBN: 978-1-62708-221-1
..., it is not yet an economical proposition to examine every welded detail by this means. As these examples show — no matter how good the reputation of the manufacturer, and the excellence and vigilance of his inspection and quality control staff — examples of criminal malpractice which could lead to serious...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.auto.c9001612
EISBN: 978-1-62708-218-1
... edge distance and improper cleaning of the mating surfaces before welding may have contributed to the propensity to failure. Acknowledgments The cooperation and help rendered by the staff of the Materials Science & Technology Division, TCIRD during the investigation is greatly acknowledged...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.process.c9001613
EISBN: 978-1-62708-235-8
... to reduce the hardness after carburizing, completely eliminated the problem. Acknowledgments The cooperation and help rendered by the staff of the Materials Science & Technology Division, TCIRD during the investigation is greatly acknowledged by the author. The author is also thankful...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.c9001656
EISBN: 978-1-62708-219-8
... obtained from the International Lead Zinc Research Organization and Argonne National Laboratories as portion of their OTEC research. The Electron Microscope Unit staff of the University of Sydney are thanked for their cooperation in these studies. References References 1. Roper H...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.marine.c9001720
EISBN: 978-1-62708-227-3
... of the hull plate and, indirectly, the integrity of the fuel oil tanks. Acknowledgments Assistance by the U.S.S. Arizona Memorial Staff, National Park Service, at Pearl Harbor, Hawaii and the Submerged Cultural Resources Unit, HPS, Santa Fe, New Mexico are gratefully acknowledged. They provided...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.process.c9001615
EISBN: 978-1-62708-235-8
... of the material during upset forging. Strict control over the inclusion content in the raw material by changing the vendor eliminated the problem. Acknowledgments The cooperation and help rendered by the staff of Materials Science & Technology Division, TCIRD during the investigation is greatly...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.modes.c9001487
EISBN: 978-1-62708-234-1
... possibilities and following discussions with the owners' engineering staff and the makers of the set, it was concluded that short circuits had developed in the rotor and this view was strengthened when a close cheek of the station records showed that an increase of excitation current for a given load condition...
Series: ASM Handbook
Volume: 11A
Publisher: ASM International
Published: 30 August 2021
DOI: 10.31399/asm.hb.v11A.a0006815
EISBN: 978-1-62708-329-4
... such a thing.” For example, the minimum allowable brake rotor thickness and the minimum allowable brake pad thickness were both specified in the maintenance manual for a passenger transit vehicle. The provider of the equipment assumed that the professional maintenance staff, in charge with the safe upkeep...
Series: ASM Handbook
Volume: 11B
Publisher: ASM International
Published: 15 May 2022
DOI: 10.31399/asm.hb.v11B.a0006868
EISBN: 978-1-62708-395-9
..., the quality assurance staff from any or all of these groups, the business development or marketing group, and so on. Each project will require a different composition for this development team. The idea is to gather the stakeholders responsible for each functional piece of the development process...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.marine.c9001591
EISBN: 978-1-62708-227-3
... the outfitting of the ship, to permit the loading of provisions on board for the voyage, to secure an adequate supply of coal because of a miners strike, and to conclude the hiring of the hotel staff and the ship's crew. The Voyage Shortly before noon on Wednesday, 10 April, the lines holding the RMS...
Series: ASM Failure Analysis Case Histories
Volume: 3
Publisher: ASM International
Published: 01 December 2019
DOI: 10.31399/asm.fach.v03.c9001761
EISBN: 978-1-62708-241-9
... distribution along the crankshaft and could have resulted in overstressing some journal/ pin fillets, thereby enhancing failure. Acknowledgments This study was supported by Kuwait University under grant no. EM 04/06. The authors would like to thank the Faculty of Science for providing their facilities...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.power.c9001616
EISBN: 978-1-62708-229-7
... by eliminating settlement of flue gas species. Care has been taken during assembly to avoid deep or severe dents (hammer blows, bending, etc.) on the tubes, which accelerated the corrosion in local regions. Acknowledgments The cooperation and help rendered by the staff of Materials Science...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.power.c9001473
EISBN: 978-1-62708-229-7
... sustained by the generator. The main lesson to be learned from the occurrence is that it is obviously desirable to ensure that all operating staff are fully conversant with the proper mode of synchronising and that they are periodically re-trained in what is, after all, an exacting operation. The risk...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.c9001548
EISBN: 978-1-62708-219-8
... be as independent as possible. Independent consultants generally will have more credibility in court than people from one's own staff who naturally have a vested interest in the outcome. In this case, had the defense retained expert assistance (including the retention of a wood technologist) at an earlier stage...