1-20 of 355

Search Results for Bridges

Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.9781627082198
EISBN: 978-1-62708-219-8
Series: ASM Handbook Archive
Volume: 11
Publisher: ASM International
Published: 01 January 2002
DOI: 10.31399/asm.hb.v11.a0001821
EISBN: 978-1-62708-180-1
... Abstract This article illustrates the defects, which result because of poor-quality welds in the bridge components. The cracks resulting from the use of low fatigue strength details are also discussed. The article describes the effect of out-of-plane distortion in floor-beam-girder connection...
Series: ASM Handbook
Volume: 11A
Publisher: ASM International
Published: 30 August 2021
DOI: 10.31399/asm.hb.v11A.a0006833
EISBN: 978-1-62708-329-4
... Abstract This article provides the framework for the investigation of bridge failures. It explains the types of bridge loading and presents the regulatory provisions for bridges. Some bridge failures in the U.S. that resulted in significant changes in bridge manufacturing, design, regulation...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.c9001147
EISBN: 978-1-62708-219-8
... Abstract The century-old Harvard bridge spans the Charles River between Boston and Cambridge. About half of the 23 spans are suspended by wrought iron eyebars. Recent failures of some of these eyebars were examined. The primary cause of failure was the seizure of the joints at the eyebar pin...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.conag.c9001588
EISBN: 978-1-62708-221-1
... ductility direction of the transition joint plate, lamellar tearing of plate material occurred at the boxed I-beam fillet weld attachment. Brittle fracture of this joint precipitated global collapse of the truss structure. Bridges (structures) Ore conveyors Structural steel Brittle fracture...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.process.c0048099
EISBN: 978-1-62708-235-8
... Abstract A bridge wheel on a crane, forged from 1055 steel, fractured after one year of service. The wheel fractured in the web between the hub and the rim. A small area containing beach marks that originated in a heavily burned area on the web surface was revealed by visual examination...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.c9001544
EISBN: 978-1-62708-219-8
... Abstract A large crack developed at a girder-truss joint area of the Fremont bridge in Portland, OR, on 28 Oct 1971. It occurred during a positioning procedure involving a junction piece welded to a girder, starting as a brittle fracture and terminating in plastic hinges in the girder web welds...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.aero.c9001600
EISBN: 978-1-62708-217-4
... Abstract This paper summarizes the results of a failure analysis investigation of a fractured main support bridge made of 7075 aluminum alloy from an army helicopter. The part, manufactured by “Contractor IT,” failed component fatigue testing while those of the original equipment manufacturer...
Series: ASM Failure Analysis Case Histories
Volume: 1
Publisher: ASM International
Published: 01 December 1992
DOI: 10.31399/asm.fach.v01.c9001111
EISBN: 978-1-62708-214-3
... Abstract A catastrophic brittle fracture occurred in a welded steel (ASTM A517 grade H) trapezoidal cross-section box girder while the concrete deck of a large bridge was being poured. The failure occurred across the full width of a 57 mm (2 1 4 in.) thick, 760 mm (30 in.) wide flange...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.c9001135
EISBN: 978-1-62708-219-8
... Abstract In 1979, during a routine bridge inspection, a fatigue crack was discovered in the top flange plate of one tie girder in a tied arch bridge crossing the Mississippi River. Metallographic analysis indicated a banding or segregation problem in the middle of the plate, where the carbon...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.bldgs.c9001219
EISBN: 978-1-62708-219-8
... Abstract During construction of a river bridge with 80 twisted cables, one or more fractures were found in each of 21 wires of 18 cables before assembly. All were located at the outside wrapping whose Z-profile wires were galvanically zinc-coated. It was suspected that hydrogen played a role...
Series: ASM Failure Analysis Case Histories
Publisher: ASM International
Published: 01 June 2019
DOI: 10.31399/asm.fach.matlhand.c0048102
EISBN: 978-1-62708-224-2
... Abstract A bridge wheel from a 272,160 kg stripper crane fractured in the web near the rim after one year of service. The wheel was forged from 1055 steel, and the tread, hub faces, and hub bore were machined. Beach marks indicative of fatigue at ten locations were revealed by macroscopic...
Image
Published: 01 January 2002
Fig. 22 Surface burning that initiated fracture in the web of a crane-bridge wheel forged from 1055 steel. Etched with 2% nital. Approximately 35× More
Image
Published: 01 January 2002
Fig. 23 1055 steel crane-bridge wheel that failed by fatigue. (a) Fracture surface of the crane-bridge wheel. Fatigue originated at forging defects. Dark areas are fatigue beach marks. (b) Micrograph of a nital-etched section through the fatigue origin showing a gross forging defect along More
Image
Published: 01 January 2002
Fig. 8 Cracks in the Quinnipiac River Bridge after 9 years of service. (a) Crack in the girder web at the longitudinal stiffener groove weld. (b) Crack in the longitudinal stiffener weld More
Image
Published: 01 January 2002
Fig. 9 Cracked girder at the Lafayette Street Bridge. More
Image
Published: 01 January 2002
Fig. 1 Collapse of pedestrian bridge over a highway More
Image
Published: 01 January 2002
Fig. 4 Sand-cast low-alloy steel eye connector from a floating-bridge pontoon that broke under static tensile loading. (a) Schematic illustration of pontoon bridge and enlarged view of eye and clevis connectors showing location of fracture in eye connector. (b) A fracture surface of the eye More
Image
Published: 01 December 1992
Fig. 1 Typical section of the failed bridge. More
Image
Published: 30 August 2021
Fig. 2 Golden Gate Bridge. Courtesy of public-domain-photos.com More