Powerline Tower Arm Failure Analysis Available to Purchase
-
Published:2019
Abstract
Arms bolted to powerline towers were falling off two weeks after installation. Metallurgical and chemical analysis performed on the base metal, weld zone, and heat-affected zone showed acceptable quality material. Residual stress appeared to be responsible for the high failure rate. The sources of residual stress included welding, environment, and assembly operation.
Wayne Reitz, Ph.D., Powerline Tower Arm Failure Analysis, ASM Failure Analysis Case Histories: Buildings, Bridges, and Infrastructure, ASM International, 2019, https://doi.org/10.31399/asm.fach.bldgs.c9001618