Skip to Main Content

Abstract

The working fluid of a hypersonic wind tunnel is freon 14 heated in molten-metal-bath heat exchangers. The coils of the heaters have failed several times from various causes. They have been replaced each time with a stainless steel deemed more appropriate, but they continue to fail. In this case study, the history of failures is traced, the causes are analyzed, and recommendations are made for future design and maintenance. Coils fabricated from AISI 316 should provide satisfactory service life if reasonable precautionary measures are observed during maintenance and testing.

You do not currently have access to this chapter.
Don't already have an account? Register

G. Scipioni, R.T. Marloth, O.S. Es-Said, 2019. "Failure of Lead Bath Heaters in a Hypersonic Wind Tunnel", ASM Failure Analysis Case Histories: Failure Modes and Mechanisms

Download citation file:


Close
Close Modal
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close Modal
Close Modal