Arms bolted to powerline towers were falling off two weeks after installation. Metallurgical and chemical analysis performed on the base metal, weld zone, and heat-affected zone showed acceptable quality material. Residual stress appeared to be responsible for the high failure rate. The sources of residual stress included welding, environment, and assembly operation.

You do not currently have access to this chapter.
Don't already have an account? Register

Wayne Reitz, Ph.D., 2019. "Powerline Tower Arm Failure Analysis", ASM Failure Analysis Case Histories: Buildings, Bridges, and Infrastructure