Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Authors
- Author Affiliations
- Full Text
- Abstract
- Keywords
- DOI
- ISBN
- EISBN
- Issue
- ISSN
- EISSN
- Volume
- References
Filter
- Title
- Authors
- Author Affiliations
- Full Text
- Abstract
- Keywords
- DOI
- ISBN
- EISBN
- Issue
- ISSN
- EISSN
- Volume
- References
Filter
- Title
- Authors
- Author Affiliations
- Full Text
- Abstract
- Keywords
- DOI
- ISBN
- EISBN
- Issue
- ISSN
- EISSN
- Volume
- References
Filter
- Title
- Authors
- Author Affiliations
- Full Text
- Abstract
- Keywords
- DOI
- ISBN
- EISBN
- Issue
- ISSN
- EISSN
- Volume
- References
Filter
- Title
- Authors
- Author Affiliations
- Full Text
- Abstract
- Keywords
- DOI
- ISBN
- EISBN
- Issue
- ISSN
- EISSN
- Volume
- References
Filter
- Title
- Authors
- Author Affiliations
- Full Text
- Abstract
- Keywords
- DOI
- ISBN
- EISBN
- Issue
- ISSN
- EISSN
- Volume
- References
NARROW
Format
Topics
Subjects
Article Type
Volume Subject Area
Date
Availability
1-2 of 2
Chromium steel
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
AM-EPRI2016, Advances in Materials Technology for Fossil Power Plants: Proceedings from the Eighth International Conference, 600-609, October 11–14, 2016,
Abstract
View Paper
PDF
Through inner wall oxidation scale thickness measurement, sampling tests and installation of wall temperature measuring device in the boiler, the equivalent wall temperature and its distribution of secondary high temperature reheater tube were estimated and verified, and the temperature field distribution of tube platen which is of single peak distribution in the direction vertical to tube platen and an apparent lower temperature distribution covered by the smoke shield at the side of boiler wall were both obtained. For the middlemost 10CrMo910, the wall temperature of individual tube was getting close to 600°C. Afterwards material state and residual creep life of tube platen were estimated and calculated. The results of estimate and calculation show that the tube platen in the middle is not suitable for further service due to its degraded material states and lower antioxidant ability. Thus with consideration of distribution characteristics of temperature field, parts of tube platens in the middle are proposed to be replaced with T91 tubes. Furthermore, to avoid onsite heat treatment, 10CrMo910 tube covered by the smoke shield in the boiler was reserved, and a small piece of 10CrMo910 tube was welded at the inlet and outlet ends respectively in the manufactory.
Proceedings Papers
AM-EPRI2013, Advances in Materials Technology for Fossil Power Plants: Proceedings from the Seventh International Conference, 537-548, October 22–25, 2013,
Abstract
View Paper
PDF
In this paper, the performance of T23 and 12Cr1MoVG water wall tubes as well as their welded joints in engineering applications is reported. It was found that the T23 water wall tube may have water leak problems during its operation. In order to make sure the safe operation, leakage reasons of T23 water wall tube were analyzed and improvement measures were taken. Recommendations on the choice of water wall material of 1000MW USC tower boiler are given.